Electrical Engineers are on board!
1 | Startup of a 6 kV Power Factor Controller The startup of an existing, amended controller has been completed |
2 | Failure of the transformer! The spare is on stock (fortunatelly), but how to get it working? |
3 | Why maintenance is necessarry? Electrical failure came at worst yesterday evening at Super Bowl. |
We always prepare our switching automatics according to the individual needs. The system controls 2 equal intakes and one electric rail cutout. Configurations can be chosen from different intakes, which will be the base intake (mainly according to the redeemed amount of energy, which is the cost of the electric energy). The system can work from 220VDC or UPS or from 230VAC.
The system takes care of the current of all the intakes phase by phase, and decides about the necessary switching command.
Why to choose our solution?