1 | Startup of a 6 kV Power Factor Controller The startup of an existing, amended controller has been completed |
2 | Failure of the transformer! The spare is on stock (fortunatelly), but how to get it working? |
3 | Why maintenance is necessarry? Electrical failure came at worst yesterday evening at Super Bowl. |
Startup of a 6 kV Power Factor Controller |
2013. június 05. | |
The startup of an existing, amended controller has been completed | ||
|
Failure of the transformer! |
2013. március 01. | |
The spare is on stock (fortunatelly), but how to get it working? | ||
|
Why maintenance is necessarry? |
2013. február 04. | |
Electrical failure came at worst yesterday evening at Super Bowl. | ||
|
Lecture on the Siemens Systemintegrator Conference |
2012. október 10. | |
Denkisys was invited to the yearly held Systemintegrator Conference as a lecturer. | ||
|
Protection against electric shock, fire and lightning |
2012. július 25. | |
Contact us for your safety and in order to compliance of regulations.... | ||
|
The boyler is ready! |
2012. július 19. | |
After a long tuning, setup of the boylercontroller got to its final state. | ||
|
Boylercontrol is ready...... |
2012. április 25. | |
at the Dunaföldvár factory of Pannónia Ethanol. | ||
|
A Hungarian Ltd - wellknown in Europe - choose our solution..... |
2012. február 28. | |
for their comprehensive energymanagement system. | ||
|